Environment:
Windows Server - 2008 R2
SQL Server - 2008 R2 SP3 Enterprise (x64) ; Type- Cluster
Nodes part of SQL Cluster-
Server-A and Server-B
Server-A( failover Cluster Installation done)
Server-B(Add node Installation done)
Issue : Server A got shutdown abruptly and systems team is unable to get it back online and has asked to rebuild the server .
Since Server A had Full installation in this case what steps should I follow to get the server rebuilt from scratch and add to the cluster .
Is Add node installation is correct option here ?
KSH