I missed the ability to restore based on a time (10/23 6pm) due to our purge cycle in our production environment, but I was able to obtain the 10/18 full backup, the 10/23 differential backup, and the 4, 10/23 trans. log backups. I moved all the fore mentioned files to a staging environment, and now I am trying to restore all of the files to 10/23 6pm and I get "The log or differential backup cannot be restored because no files are ready to rollforward" error
Thanks in advance for any help!
John Chendorain