Hello,
I am using SQL 2012 SE with clustering on Windows server 2008 R2. Now I want migrate it to windows server 2012 with minimal down time. So I want to evict the passive node and add a new node with windows server 2012 and install sql server 2012 SE on the new passive node and perform a failover(make the node with 2012 OS as active) and then evict the new passive node and add another node with windows 2012 and then do the same thing?
Is this possible? Experts need your valuable inputs and advise.
Thanks